Planning Permission Cost 2026: Fees, Extras and the 8 December Rise

Last updated: 31 October 2026 · Fees for England unless stated (Wales and Scotland notes below)
Short answer: In England, a householder planning application for an extension, loft conversion or other alteration to a house costs £548 in council fees. It is due to rise to £575 for applications made from 8 December 2026 (SI 2026/1192, made on 10 November 2026). Add about £99 if you apply through the Planning Portal, plus drawings. Most homeowners pay roughly £1,000–£4,500 in total for planning permission.
- Lawful development certificate (proposed): £274, rising to £287.50
- Prior approval for a larger home extension: £249, rising to £310
- Wales: £585 · Scotland: about £371 (fees set separately)
The planning permission cost for most home extensions is far smaller than the build itself, but it has gone up sharply. The householder fee in England was £258 until March 2025, and it will have more than doubled by December 2026. This guide sets out every council fee a homeowner is likely to meet, the extra costs that usually come with them, three worked examples, and two changes coming in right now: the national fee rise on 8 December, and new rules from 31 October 2026 that stop most householder applications going to a planning committee.
How much does planning permission cost in 2026?
Planning fees in England are set nationally, not by your council, so the fee for an extension is the same in Cornwall as it is in Camden. The table below shows the current fees (in force since 1 April 2026) and the increased fees that apply from 8 December 2026 under SI 2026/1192, made on 10 November 2026. All figures come from the Planning Portal’s published fee schedule.
| Application type (England) | Fee now (from 1 Apr 2026) | Fee from 8 Dec 2026* |
|---|---|---|
| Householder application: extension, loft conversion, garage conversion or other alteration to one house | £548 | £575 |
| Householder works within the garden only (outbuilding, fence, wall, gate) | £272 | £285 |
| Householder application covering two or more houses | £1,083 | £1,130 |
| Lawful development certificate, proposed works (half the full fee) | £274 | £287.50 |
| Lawful development certificate, existing works (same as the full fee) | £548 | £575 |
| Prior approval: larger home extension (Class A) | £249 | £310 |
| Prior approval: adding storeys to a house (Class AA) | £249 | £310 |
| Discharge of conditions (householder, per request) | £89 | £125 |
| Non-material amendment (householder) | £46 | £53 |
| Section 73 variation of a condition (householder) | £89 | £112 |
| Full application for a new house (fewer than 10) | £610 per house | £752 per house |
*The December fees are set by SI 2026/1192 (made 10 November 2026, in force 8 December 2026). Source: Planning Portal, current and forthcoming English application fees (updated draft of 1 September 2026). The lawful development certificate figures follow the rule that a proposed LDC costs half the equivalent application fee.
Wales, Scotland and Northern Ireland
Each nation sets its own fees. In Wales, a householder application costs £585 for applications made from 1 December 2025 (Pembrokeshire County Council’s published fee guide), and the Planning Portal gives the same figure. In Scotland, fees rose by 3.9% on 1 April 2026 under Planning Circular 1/2026; councils such as West Lothian list £371 for a house extension. Northern Ireland has its own fee schedule, so check with your council. Everything else in this guide is about England.
The 8 December 2026 planning fee increase
On 23 October 2026 the Planning Portal confirmed that English planning fees are due to rise on 8 December 2026. The government wants councils to recover at least 90% of the cost of deciding applications. For homeowners, the main change is that the householder fee goes from £548 to £575, which is £27 more. Smaller applications rise by bigger percentages: prior approval for a larger home extension goes up by £61 (about 25%), and discharging a condition goes up by £36 (about 40%).
What matters is when your application is submitted and paid, not when you started drawing it up:
- Applications submitted through the Planning Portal before 17:00 on Monday 7 December 2026 pay the current fee.
- Drafts that haven’t been submitted, and applications whose payment hasn’t cleared by then, will be charged the new fee. That includes bank transfers and cheques.
- The Planning Portal suggests starting bank transfers by 2 December and posting cheques by 27 November.
Two more changes are on the way. Fees will rise with inflation every 1 April, starting in 2027. The government also plans to let councils set their own fees from the 2027/28 financial year, and Planning Geek’s summary of the draft rules says councils could charge up to 30% above the national rate where they can show higher costs. So if your drawings are nearly ready, it’s worth submitting before 7 December. Don’t rush an incomplete application, though. An invalid application costs you more time than the £27 you’d save.
What else does planning permission cost? (the extras)
The council fee is usually the smallest part of the cost. You will almost always need scaled drawings, and you may need surveys or professional help. These are typical market ranges from the HomeOwners Alliance and Planwatch, not fixed prices. Get quotes for your own project.
| Cost item | Typical range | When you need it |
|---|---|---|
| Planning Portal service charge | £99 inc VAT (Band 1) | Most online applications with a fee over £100 |
| Drawings for a simple single-storey extension | £500 – £1,500 | Always: location plan, site plan, existing and proposed plans and elevations |
| Drawings for a loft conversion | £800 – £2,000 | Planning application or LDC |
| Architect’s planning drawings, single-storey extension | £1,000 – £2,500 | If you want design input as well as drawings |
| Architect’s planning drawings, two-storey extension | £2,000 – £3,500 | Larger or more sensitive schemes |
| Council pre-application advice (householder) | £50 – £150 | Optional; useful in conservation areas or on tricky sites |
| Planning consultant (householder) | £500 – £1,500 | Borderline schemes, refusals, or appeals |
| Tree survey | £300 – £1,000 | Trees close to the build or protected by a tree preservation order |
| Flood risk assessment | £500 – £2,000 | Homes in flood zones 2 or 3 |
| Heritage statement | £500 – £2,000 | Listed buildings and conservation areas |
| Preliminary bat or ecology survey | £300 – £1,200 | Roof works, especially lofts in older or rural houses |
Sources: Planning Portal (service charge); Planwatch, “How much does planning permission cost” (updated 20 Oct 2026); HomeOwners Alliance, “Cost of planning permission”; Self-Build.co.uk. Professional fees vary by region and complexity.
Planning permission is separate from building regulations approval, which nearly every extension or loft conversion also needs. Budget for building control fees and a structural engineer as well. Our house extension cost guide includes these in its overall figures.

Do you even need to pay for planning permission?
Many extensions and most loft conversions don’t need a planning application, because they fall under permitted development rights. There are three main routes, and each costs a different amount:
| Route | Council fee (now → 8 Dec) | Decision time | Best for |
|---|---|---|---|
| Permitted development, no application | £0 | None | Small rear extensions and lofts clearly within the limits (risky if you sell without proof) |
| Lawful development certificate (proposed) | £274 → £287.50 | 8-week target | Proving a permitted development project is lawful, for buyers and lenders |
| Prior approval: larger home extension | £249 → £310 | 42 days | Single-storey rear extensions of up to 6m (attached) or 8m (detached) |
| Householder planning application | £548 → £575 | 8-week target | Anything outside permitted development: two-storey side extensions, front dormers, flats, conservation areas |
Our permitted development extension rules set out the size limits, and our loft conversion planning guide covers the volume allowances for dormers and hip-to-gable conversions. If you are building under permitted development, a lawful development certificate is usually worth the fee. It gives you a council-issued document to show a buyer’s solicitor when you sell.
Worked examples: what homeowners actually pay
These examples use the council fees above, the £99 Planning Portal charge, and the mid-market professional ranges in the extras table. They do not include building regulations, party wall costs or the build itself.
Example 1: 6m single-storey rear extension on a semi (prior approval)
- Prior approval fee: £249 (or £310 from 8 December)
- Planning Portal service charge: £99
- Simple extension drawings: £500 – £1,500
- Total: about £850 – £1,850 now, or £910 – £1,910 from 8 December
Example 2: Two-storey side extension (householder application)
- Householder fee: £548 (or £575 from 8 December)
- Planning Portal service charge: £99
- Architect’s planning drawings: £2,000 – £3,500
- Optional pre-application advice: £50 – £150
- Total: about £2,650 – £4,300 now, or £2,675 – £4,325 from 8 December
Our two-storey extension cost guide covers what the build itself is likely to cost.
Example 3: Rear dormer loft conversion under permitted development, with an LDC
- Lawful development certificate (proposed): £274 (or £287.50 from 8 December)
- Planning Portal service charge: £99
- Loft conversion drawings: £800 – £2,000
- Total: about £1,175 – £2,375 now, or £1,185 – £2,385 from 8 December
On a typical £60,000–£100,000 project, planning normally adds 1–5% to the budget. A refusal costs more: you pay the fee again to resubmit, along with the cost of revised drawings.
New from 31 October 2026: officers now decide householder applications
From today, a new national rule changes who makes the decision on your application. The Town and Country Planning (Discharge of Local Planning Authority Functions) (England) Regulations 2026 (SI 2026/854) came into force on 31 October 2026. They set up a national scheme of delegation, which puts planning applications into two groups:
- Schedule 1 applications must be decided by a planning officer. They can’t go to a planning committee. This group includes householder applications, lawful development certificates, prior approvals, non-material amendments and applications to discharge conditions.
- Schedule 2 covers everything else. It is decided by officers by default, and can go to committee only if a nominated senior officer and a nominated councillor (usually the chief planning officer and the committee chair) agree it raises a significant planning issue or an issue of economic, social or environmental significance to the area.
What it means for your extension
- No more committee call-ins. Your ward councillor can no longer send a householder application to committee, and a large number of neighbour objections won’t move it there either. Freeths and Foot Anstey both describe the referral bar for Schedule 2 cases as high.
- Neighbours can still comment. Consultation is unchanged, and officers still weigh objections against local and national policy. Spelthorne Borough Council’s notice on the change says the same.
- Some exceptions. A householder application moves into Schedule 2 if it is retrospective, linked to listed building consent, or connected to the council or one of its members (Freeths).
- No change to the fee or the 8-week target. The rules change who decides, not what it costs. If you are refused, you can still appeal to the Planning Inspectorate.
In practice, this should make decisions on ordinary extensions more predictable, as they will be decided on policy rather than on local politics. The regulations also cap planning committees at 13 members and require the government to review the scheme by 31 October 2028.

How to keep planning permission costs down
- Check permitted development first. If your project fits within the limits, an LDC costs half the householder fee, and a prior approval costs even less.
- Submit before 17:00 on 7 December 2026 if your application is ready. You’ll save £27 on a householder application and £61 on a prior approval.
- Get it right first time. You no longer get a free resubmission after a refusal, so a second attempt means paying the full fee again. Pre-application advice at £50–£150 can be cheaper than a refusal.
- Bundle the work. A rear extension and a loft dormer for the same house can go in one householder application for a single fee.
- Use a drawing service for simple schemes and save architects for complex or sensitive sites.
- Ask for a fixed price from your designer, covering one round of amendments the council may ask for.
Once you have permission, our party wall agreement guide explains the next legal step if you share a wall or boundary with a neighbour. Our extension finance guide covers how to pay for the build.
Got your planning sorted? Compare builders’ prices
Tell us about your extension or loft conversion and get free, no-obligation quotes from local builders.
Frequently asked questions
How much does planning permission cost for an extension?
In England, the council fee for a householder application is £548. It is due to rise to £575 for applications made from 8 December 2026. With a £99 Planning Portal charge and drawings, most homeowners spend £1,000–£4,500 in total.
Are planning fees going up in December 2026?
Yes. The regulations (SI 2026/1192) were made on 10 November 2026. From 8 December 2026 the householder fee rises to £575 and prior approval for a larger home extension rises to £310. Applications submitted and paid before 17:00 on 7 December pay the current fees.
What is the fee for discharging a planning condition?
For a householder permission it is £89 per request, rising to £125 from 8 December 2026. For other types of development it is £309, rising to £435 according to Planning Geek’s summary of the regulations.
Can I draw my own plans for planning permission?
Yes. There is no legal requirement to use an architect. Your drawings must still meet your council’s validation requirements, which usually means a location plan, a site plan, and scaled existing and proposed floor plans and elevations. If they don’t, the application will be returned as invalid.
Do I get my money back if planning is refused?
No. The fee pays for the council’s assessment, not the result. The free resubmission (the “free go”) was abolished in December 2023, so a revised application costs the full fee again. Householder appeals to the Planning Inspectorate are free.
Can my local councillor still send my extension to planning committee?
Not since 31 October 2026. Householder applications are now in Schedule 1 of the national scheme of delegation, so a planning officer must decide them. The exceptions are retrospective applications, applications linked to listed building consent, and applications connected to the council.
What can I build without paying for planning permission?
Many single-storey rear extensions, rear dormer loft conversions and garage conversions are permitted development and need no application. Flats, listed buildings and some conservation areas have fewer rights or none. Our permitted development guide lists the limits.
Sources
- Planning Portal, Current and forthcoming English application fees (draft of 1 Sept 2026)
- Planning Portal blog, English planning application fees increase on 8th December 2026 (23 Oct 2026)
- Planning Portal, How much does a planning application cost?
- legislation.gov.uk, SI 2026/854, Town and Country Planning (Discharge of Local Planning Authority Functions) (England) Regulations 2026
- Pinsent Masons Out-Law, Standardisation of planning decision-making in England (27 Oct 2026)
- Freeths, The national scheme of delegation explained
- Foot Anstey, The national scheme of delegation: what it means for planning decisions
- Spelthorne Borough Council notice via LOSRA, Changes to planning decision-making from 31 October 2026
- Planning Geek, Planning fees 2026: new fees from 8 December
- Pembrokeshire County Council, Guide to the fees for planning applications in Wales
- Scottish Government, Planning circular 1/2026: planning fees; West Lothian Council, Householder application
- Planwatch, How much does planning permission cost; HomeOwners Alliance, Cost of planning permission; Self-Build.co.uk, Planning hidden costs
Fees correct at 31 October 2026 for England unless stated. The 8 December 2026 fees are set by SI 2026/1192. Professional fees are typical ranges, not quotes. Extension Costs is an independent cost guide, not a builder, architect or planning consultant. Check your own council’s requirements before applying.