Building Regulations Cost in 2026: UK Council Fees Compared

The building regulations cost for a typical house extension, loft or garage conversion in 2026 is somewhere between about £370 and £1,550 in council fees, depending on where you live and how big the job is. That’s a wide range for the same piece of paperwork. We’ve read the published 2026/27 charging schedules of nine councils in England and set them side by side, so you can see what your project is likely to cost, why the fees differ, and how to avoid paying the most expensive one: regularisation.
Quick answer
- Single-storey extension (about 10–40m²): £499 (Chorley) to £1,440 (Arun) for a full plans application, across the nine councils we checked.
- Loft conversion with a dormer: £560 (Chorley) to £1,536 (Arun).
- Garage conversion: £374 (Chorley) to £1,024 (Arun).
- Regularisation (approval after the work is done): the dearest route, with no VAT. For a 10–40m² extension, £803 (West Northants) to £1,801 (Arun).
- New in November 2026: new charging regulations (SI 2026/1094) took effect on 6 November. Councils can now recover more of their costs, so expect fee rises when they publish new schemes.
Last checked: 16 November 2026. Council fees for England; Wales and Scotland differ.
What’s changed: the new building control charging rules
On 6 November 2026, the Building (Local Authority Charges and Amendments Relating to Charging) (England) Regulations 2026, SI 2026/1094, came into force. They replace the 2010 charging regulations that councils had used for 16 years.
The main change is cost recovery. Planning Geek’s summary of the regulations says a council’s income “should as far as possible match the costs of its chargeable functions and advice”. Councils can now include a share of overheads, depreciation and the cost of capital in what they charge. They must also publish an annual statement showing what they took in charges, what the work cost them, and any surplus or deficit.
What this means for you:
- There’s still no national fee. Each of the 250-plus councils sets its own scheme, which is why prices vary so much.
- Existing schemes carry on until a council replaces them. A new scheme must be published online at least seven days before it applies.
- Fees are likely to rise as councils move to full cost recovery. The figures in this guide are the April 2026 schedules; check your council’s page for an update before you apply.
- Paying isn’t approval. As Planning Geek puts it, paying a building control charge “does not regularise defective work, remove a notice or guarantee approval”.
How building regulations cost is worked out
Building regulations approval is separate from planning permission. Planning is about what a building looks like and how it affects neighbours. Building regulations are about whether it’s safe, warm, dry and structurally sound. Most extensions, loft conversions and garage conversions need building regulations approval even when they don’t need planning permission.
You pay for that approval in one of three ways, depending on the route you choose.
| Route | What you pay | How it works |
|---|---|---|
| Full plans | A plan charge when you apply, then an inspection charge (usually invoiced after the first site visit) | Building control checks your drawings before work starts, then inspects on site. Councils normally have five weeks to decide, or two months if you agree. |
| Building notice | One charge, paid up front | No detailed plans are checked. You give notice, start work, and the inspector tells you on site what’s needed. Not allowed for work near or over a public sewer. |
| Regularisation | One charge, usually 120–150% of the building notice fee, with no VAT | For work already done without approval. The inspector may ask you to open up floors, walls or ceilings to see what’s inside. |
Fees are set by the type of work and its size: extensions by floor area, loft conversions by whether there’s a dormer, smaller jobs by estimated cost. Most councils charge VAT at 20% on full plans and building notice fees. Regularisation is outside the scope of VAT at every council we checked that says either way.
You don’t have to use the council. Private registered building control approvers can do the same job and set their own prices. Checkatrade’s (older, 2024) guide says their rates are “usually around the same” as councils’. Get a written quote and compare it with your council’s published fee.
Building regulations fees compared: nine councils in 2026
These are the published 2026/27 charges for a single-storey extension of roughly 10–40m², the size of a typical rear or side extension. Band edges differ, so we’ve used the band each council puts a 20m² extension in.
| Council | Band | Full plans (plan + inspection) | Building notice | Regularisation (no VAT) |
|---|---|---|---|---|
| Chorley | 5–40m² | £499.20 | £499.20 | Individually assessed |
| Walsall* | 10–40m² | £329 + £343 = £672 | £805 | £967 |
| West Northamptonshire | 10–40m² | £191.75 + £528.50 = £720.25 | £720 | £802.75 |
| Cheshire West and Chester | 10–40m², single storey | £234.82 + £501.50 = £736.32 | £846.77 | £920.40 |
| Milton Keynes | 10–40m² | £368.40 + £471.60 = £840 | £922.80 | £1,050 |
| Windsor & Maidenhead | 10–40m², single storey | £432 + £558 = £990 | £1,138.50 | £1,423.13 |
| Richmond upon Thames | Under 40m², single storey | £427.60 + £641.40 = £1,069 | £1,069 | £1,069 |
| Enfield | 6–40m² | £1,112 | £1,112 | £1,390.01 |
| Arun | 15–60m² | £1,200.38 + VAT = £1,440.46 | £1,440.45 | £1,800.56 |
Fees include VAT at 20% unless stated. *Walsall’s page doesn’t say whether VAT is included. Chorley says regularisation will “typically” be “a minimum of 150% greater than the gross Building Notice charge”. Milton Keynes’ page doesn’t date its tables, so confirm they’re the current year. Sources: each council’s published schedule, April 2026 (listed below).
The dearest council here charges almost three times as much as the cheapest for the same size of extension. Location matters more than you might expect. It isn’t simply a London-versus-the-rest split either: Arun, on the West Sussex coast, is dearer than both London boroughs we checked.
Loft and garage conversions
| Council | Loft conversion with dormer (full plans) | Garage conversion (full plans) |
|---|---|---|
| Chorley | £560.40 (up to 40m²) | £374.40 |
| Walsall* | £636 (one loft rate) | £439 |
| Cheshire West and Chester | £751.66 | £486.16 |
| West Northamptonshire | £808.25 (minimum charge) | Not listed |
| Richmond upon Thames | £1,050 (under 40m², any loft) | Individually set |
| Enfield | £1,091 (under 40m²) | £808 |
| Windsor & Maidenhead | £1,092 | £690 (up to 40m²) |
| Milton Keynes | £1,254 | £552 |
| Arun | £1,280.40 + VAT = £1,536.48 (up to 100m²) | £853.60 + VAT = £1,024.32 |
Including VAT unless stated. *Walsall VAT not stated. A loft without a dormer is cheaper at most councils, for example £912 instead of £1,092 in Windsor & Maidenhead, and £957.60 instead of £1,254 in Milton Keynes.
For the full picture on garage projects, including what the inspector checks, see our garage conversion building regulations guide.
Two-storey extensions
Most councils band extensions by floor area only, so a two-storey extension falls in the same band as a single-storey one of the same total area. Two councils in our sample charge separately. Windsor & Maidenhead charges £1,092 for a two-storey extension up to 40m² and £1,350 for 40–100m². Cheshire West and Chester charges £903.88 for a multi-storey extension under 40m².
Smaller jobs
Not every job needs a big application. Taking out a load-bearing wall and fitting a steel beam is one of the most common smaller jobs:
| Council | Fee for removing a load-bearing wall |
|---|---|
| Chorley | £187.20, inspections included |
| Windsor & Maidenhead | £300 for a single beam or chimney breast removal (full plans) |
| Enfield | £457 |
Our load-bearing wall removal cost guide covers the building work itself.

Why building control fees vary so much
Each council works out its own charges from what the service costs it to run, so the fee reflects local staff costs, travel time and how many visits the council expects a job to need. Under the old 2010 rules, councils were only meant to cover the cost of the work they charged for. The new 2026 regulations let them add a share of overheads too, so the gap between cheap and dear councils may grow rather than shrink.
The way councils draw their bands also makes a big difference. Chorley puts everything from 5m² to 40m² in one band, so a 39m² extension costs the same as a 6m² one. Arun’s middle band runs all the way to 60m². Enfield starts its first band at under 6m², then jumps to 6–40m². If your extension sits just over a band edge, a small change in size can change the fee, though it’s rarely worth redesigning a room to save a hundred pounds.
Some councils also split the fee in two. With full plans, you usually pay the plan charge when you apply and the inspection charge later, often after the first site visit. That can help with cash flow, but budget for both from the start.
What the fee pays for
The fee covers the council’s checks on your project, not the work itself. For a full plans application, that means an officer checking the drawings and calculations against the Approved Documents, then a series of site inspections. On a typical extension these are at the foundation dig, the damp-proof course, the drains, the insulation before it’s covered, the roof structure and a final visit. Each visit is booked by you or your builder before that stage is covered up. If the work passes, you get a completion certificate, which is the document your buyer’s solicitor will want to see one day.
The fee doesn’t cover putting right anything that fails. If the inspector rejects a foundation or asks for extra insulation, that’s a cost for you and your builder. Some councils also charge extra if a job needs more visits than usual, so a builder who gets it right first time saves you money.
Full plans or building notice: which is cheaper?
Many people assume the building notice is the budget option because there are no plans to check. It often isn’t. Of the nine councils, four charge more for a building notice than for full plans on a 10–40m² extension:
- Walsall: £805 against £672 (£133 more)
- Windsor & Maidenhead: £1,138.50 against £990 (£148.50 more)
- Cheshire West and Chester: £846.77 against £736.32 (£110.45 more)
- Milton Keynes: £922.80 against £840 (£82.80 more)
Chorley, Richmond, Enfield and West Northamptonshire charge the same, or within a few pence. Arun’s building notice charge matches its full plans charge including VAT.
The fee isn’t the whole story, though. Full plans means paying for proper drawings, but it also means building control has agreed the design before your builder prices it. With a building notice, anything the inspector wants changed on site is paid for at that point, sometimes after the work has been done once. For anything beyond a simple job, full plans usually works out cheaper overall.
Regularisation certificate cost
A regularisation certificate is how you get approval for work that was done without it. It’s usually needed when you sell: the buyer’s solicitor asks for a completion certificate for the extension or loft, and there isn’t one.
It’s always the most expensive route. Councils set regularisation at a percentage of the building notice fee before VAT, and don’t charge VAT on it:
- Enfield: 150% of the building notice charge. Its £1,112 extension fee (including VAT) is £926.67 before VAT, so regularisation is £1,390.01.
- Richmond: 120% of the building notice charge, which works out at £1,069 for an extension under 40m², the same as the VAT-inclusive building notice.
- Arun: £1,800.56 for a 15–60m² extension, the highest in our sample.
The fee is only the start. The inspector may ask you to dig a hole beside the foundations, lift floorboards or take down plasterboard to check insulation and steelwork. You pay to open up and make good, and to fix anything that doesn’t comply. If a beam or foundation is in question, you may need a structural engineer to inspect and report, which MyJobQuote prices at £300–£500 for a visit with a short report.
Ignoring the problem has its own costs. In England, a council can serve a notice requiring non-compliant work to be put right for up to 10 years after it was finished, and the offence of breaching building regulations now carries an unlimited fine. Indemnity insurance is sometimes offered on a sale instead, but some buyers and lenders won’t accept it, and it does nothing about a room that’s cold, damp or unsafe.
Other costs that come with building regulations
The council fee is usually the smallest part of what building regulations cost you. The bigger costs are the professional work the application needs and the building work the rules require.
| Item | Typical cost | Source |
|---|---|---|
| Structural calculations for an extension | £400–£2,000 | MyJobQuote (Nov 2026) |
| Beam calculations (steel or load-bearing wall) | £300–£900 | MyJobQuote (Nov 2026) |
| Structural drawings | £150–£500 simple; up to £1,500 larger projects | MyJobQuote (Nov 2026) |
| Structural engineer’s visit with short report | £300–£500 | MyJobQuote (Nov 2026) |
| Electrical work by someone not registered to self-certify | £559 extra (Enfield); £600 (Windsor & Maidenhead) | Council schedules |
| Planning application, if needed | £548 householder fee in England | Planning Portal |
Building regulations drawings are normally prepared by an architect or architectural technician, often as part of a wider design fee. See our architect fees guide for what that costs, and our structural engineer cost guide for the engineer’s side.
On planning: the £548 householder fee rises to £575 on 8 December 2026 under SI 2026/1192, made on 10 November 2026. Our planning permission cost guide has the details. If your work is on or near a shared wall, you may also need a party wall agreement, which is a separate cost again.
Use an electrician registered with a competent person scheme. They can self-certify their work, which avoids the extra building control charge for electrics.
Worked examples
These examples use the councils’ published fees and MyJobQuote’s November 2026 engineer prices. They’re our estimates of the building-regulations-related costs only, not quotes. Drawings, the building work and any planning fee are extra.
Example 1: 20m² single-storey rear extension, West Northamptonshire, full plans
| Item | Low | High |
|---|---|---|
| Full plans fee (plan £191.75 + inspection £528.50) | £720.25 | £720.25 |
| Structural calculations | £400 | £2,000 |
| Total | £1,120.25 | £2,720.25 |
The same extension in Arun would cost £720.21 more in council fees alone (£1,440.46 against £720.25). For the cost of the extension itself, see our house extension cost guide.
Example 2: dormer loft conversion under 40m², Richmond upon Thames, full plans
| Item | Low | High |
|---|---|---|
| Full plans fee (plan £420 + inspection £630) | £1,050 | £1,050 |
| Structural calculations (floor joists, beams) | £400 | £2,000 |
| Total | £1,450 | £3,050 |
Richmond’s fee is the same whether or not the loft has a dormer, up to 40m². Loft conversions usually need steel beams and new floor joists, so expect the engineer’s fee to be towards the middle or top of the range. Our loft conversion cost guide covers the build.
Example 3: regularising an old 25m² extension before a sale, Windsor & Maidenhead
| Item | Low | High |
|---|---|---|
| Regularisation fee (single storey, 10–40m², no VAT) | £1,423.13 | £1,423.13 |
| Structural engineer’s visit and short report | £300 | £500 |
| Total before opening up or remedial work | £1,723.13 | £1,923.13 |
Had the owner applied with full plans at the start, the fee would have been £990: £433.13 less, before counting the cost of opening up and putting right whatever the inspector finds.
Planning an extension or loft conversion? Tell us about your project and we’ll pass your details to one vetted local builder, who can include building control in their price.
How to keep building regulations costs down
- Check your council’s current fee. Look up its charging scheme before you budget. With the new rules in force, councils may publish new schemes with only seven days’ notice.
- Compare full plans and building notice. At four of our nine councils, full plans was the cheaper route on fees alone, and it was never dearer.
- Get a private approver’s quote. They set their own prices, so it’s worth one email.
- Use self-certifying trades. A registered electrician (and a registered window fitter, heating engineer and so on) avoids extra charges.
- Apply before you build. Regularisation costs more in fees at most councils, and can cost far more in opening up.
- Keep your paperwork. The completion certificate, electrical certificate and structural calculations are what a buyer’s solicitor will ask for.
Building regulations cost FAQs
How much do building regulations cost for an extension?
For a single-storey extension of about 10–40m², council fees in 2026 range from £499.20 (Chorley) to £1,440.46 (Arun) for a full plans application, across the nine councils we checked. Most are between £700 and £1,100. Structural calculations, drawings and the work itself are extra.
How much is a regularisation certificate?
Usually 120–150% of the council’s building notice fee before VAT, with no VAT added. For a 10–40m² extension that’s £802.75 in West Northamptonshire, £1,390.01 in Enfield and £1,800.56 in Arun. You’ll also pay for any opening up and remedial work the inspector asks for.
Is a building notice cheaper than full plans?
Not always. Walsall, Windsor & Maidenhead, Cheshire West and Chester and Milton Keynes all charge more for a building notice than for full plans on a 10–40m² extension. Others charge the same. Full plans also gives you approved drawings before work starts.
Do building control fees include VAT?
Full plans and building notice fees are subject to VAT at 20%, and most councils quote them including VAT. Regularisation charges have no VAT. Check the small print, as a few councils quote fees before VAT or don’t say.
Are private building control approvers cheaper than the council?
Sometimes. Private registered building control approvers set their own prices, and older guidance from Checkatrade says they’re usually around the same as councils. Get a written quote and compare it with your council’s published fee.
What changed with building control fees in November 2026?
New charging regulations (SI 2026/1094) came into force on 6 November 2026. Councils can now recover more of their full costs, including overheads, and must publish annual statements of income and costs. Existing fee schemes continue until each council publishes a new one, at least seven days before it applies.
Do I need building regulations and planning permission?
They’re separate. Many extensions and most loft and garage conversions don’t need planning permission, but almost all need building regulations approval. If you need both, you pay both: the planning householder fee in England is currently £548.
Sources
- Planning Geek: Building control charges widen (16 Oct 2026), on SI 2026/1094
- GOV.UK: Circular 05/2026: The Building (Local Authority Charges and Amendments Relating to Charging) (England) Regulations 2026
- Council fee schedules (2026/27): Chorley; Walsall; West Northamptonshire; Cheshire West and Chester; Milton Keynes; Windsor & Maidenhead; Richmond upon Thames; Enfield; Arun
- MyJobQuote: Structural engineer costs (updated 2 Nov 2026)
- Checkatrade: How much do building regs cost? (Nov 2024)
This guide is general information for England, checked on 16 November 2026. It isn’t legal or professional advice. Council fees change, and new charging schemes may be published at short notice under the November 2026 rules; always check your council’s current schedule or get a written quote. Wales, Scotland and Northern Ireland have their own building regulations and fees.